WHAT'S INCLUDED

Drywall, flooring, and millwork • Lighting and electrical • Life safety systems • Doors, hardware, and signage • Wallcovering, window treatments, and furniture installation

ProMax Seybold Nov_-13 (1)_edited.jpg
IMG_1009 copy_edited.jpg
DJI_20260220111121_0174_D_MHOYOSM4P_edited.jpg

Our Process

01

Scheduling and trade coordination, managed in-house

02

Construction executed in phases to limit disruption

03

Weekly updates to the board and management

04

Closeout documentation and warranty delivery

after.png
before.png
Before
After

Interior Renovations

Full construction execution for common area renovations, built by the same team that designed them.

SIGNS YOUR BUILDING NEEDS THIS

Renovated Sooner if Leaks Persist

An approved material alteration vote ready to move to construction • Outdated common area finishes: flooring, lighting, millwork, or wallcovering • Life safety systems due for an update • A need for one contractor to manage every trade instead of separate vendors

Renovated Sooner if Leaks Persist

SERVICE FAQ

Is this the same team that handles the design?

Yes. Design, procurement, and construction are executed by the same in-house team, which is why there's one point of contact from concept through completion.

How often should interior renovations be considered?

Common areas should get an annual check for stains, moisture damage, and wear. A full renovation is generally considered every 7 to 10 years, or sooner if repeated envelope leaks are affecting the same space, in which case the leak source should be fixed before finishes are replaced.