WHAT'S INCLUDED
Drywall, flooring, and millwork • Lighting and electrical • Life safety systems • Doors, hardware, and signage • Wallcovering, window treatments, and furniture installation



Our Process
01
Scheduling and trade coordination, managed in-house
02
Construction executed in phases to limit disruption
03
Weekly updates to the board and management
04
Closeout documentation and warranty delivery


SIGNS YOUR BUILDING NEEDS THIS
Renovated Sooner if Leaks Persist
An approved material alteration vote ready to move to construction • Outdated common area finishes: flooring, lighting, millwork, or wallcovering • Life safety systems due for an update • A need for one contractor to manage every trade instead of separate vendors
Renovated Sooner if Leaks Persist
SERVICE FAQ
Is this the same team that handles the design?
Yes. Design, procurement, and construction are executed by the same in-house team, which is why there's one point of contact from concept through completion.
How often should interior renovations be considered?
Common areas should get an annual check for stains, moisture damage, and wear. A full renovation is generally considered every 7 to 10 years, or sooner if repeated envelope leaks are affecting the same space, in which case the leak source should be fixed before finishes are replaced.